![]() The 5.5 KVA Diesel Generator |
![]() The Photocopier |
|
These two items formed the core of our first shipment we then packed smaller items
in and around them in the crate to fill any available space.
The Crate was packed with the items securely to avoid damage. It was loaded onto a lorry to start it’s 3000 mile journey. The crate was shipped on the 18 September 2005 and docked in Banjul in October. |
|
|
||||||||||||||
![]() |
![]() |
| The stationery was distributed among the children . . . . . | |
![]() |
![]() |
| . . . while training was given in the use of the photocopier. | |
![]() The diesel generator was installed and tested. |
|