The First Shipment
 

The 5.5 KVA Diesel Generator

The Photocopier
These two items formed the core of our first shipment we then packed smaller items in and around them in the crate to fill any available space.

The Crate was packed with the items securely to avoid damage. It was loaded onto a lorry to start it’s 3000 mile journey.

The crate was shipped on the 18 September 2005 and docked in Banjul in October.

     
All Items were sealed into thick poly sacks

Each sack taped securely into position

The crate starts it’s 3000 mile journey
     


The stationery was distributed among the children . . . . .


. . . while training was given in the use of the photocopier.

The diesel generator was installed and tested.